Challenges in PLC Programming: Understanding Positive and Negative Edges

In PLC programming, the positive edge and negative edge are key signal characteristics that trigger logical operations. They are commonly used to avoid signal jitter, achieve precise counting, or control execution order. If not mastered, their usage may lead to program logic confusion, false triggering, or functional failure. The following analysis covers principles, application scenarios, common issues, and solutions.

1. Principles of Positive and Negative Edges
1. Definition: Positive edge refers to the moment when a signal changes from 0 to 1. Negative edge refers to the moment when a signal changes from 1 to 0.
2. Implementation methods:

Hardware implementation: Detecting signal transitions by rapidly scanning the input signal status. Software implementation: Using PLC instructions (such as Siemens S7-1200’s FP and FN instructions) or logical expressions.

2. Typical Application Scenarios
1. Button Debouncing: Mechanical buttons may cause multiple false triggers in the PLC due to physical contact jitter. Solution: Use positive edge detection to trigger actions only when the signal stabilizes and changes.
2. Precise Counting: High-speed signals from encoders, sensors, etc., require accurate counting. Example: Use positive edge detection for pulse signals to accumulate counter values.
3. Sequential Control: Multiple devices need to start in a specific order to avoid overload from simultaneous actions. Implementation: Trigger timers with positive edges to delay the start of the next device.
4. Event Logging: Record the time points of device status changes (e.g., when a fault occurs). Implementation: Use positive edges to trigger timestamp recording functions.

3. Common Issues and Solutions
Issue 1: False Signal Triggering
Cause: Signal noise or a long scanning cycle leading to missed detections. Solution: Increase hardware filtering (e.g., RC filter circuit). Shorten the PLC scanning cycle or use high-speed input modules.
Issue 2: Inaccurate Counting
Cause: Incorrectly distinguishing between positive and negative edges, leading to repeated counts. Solution: Use dedicated counter instructions (e.g., CTU, CTD). Ensure counting is triggered only on positive edges.
Issue 3: Sequential Control Failure
Cause: Conflicts from multiple positive edge triggers. Solution: Design using a state machine to clarify the triggering conditions for each state. Add interlocking logic to prevent race conditions.

4. Programming Tips and Optimization Suggestions
1. Use Dedicated Instructions: Different PLC brands offer a variety of edge detection instructions (e.g., Mitsubishi FX series LDP, LDF). Prefer built-in instructions to reduce manual logic errors.
2. State Preservation: Save signal states in each scanning cycle for easy comparison and edge change judgment.
3. Modular Design: Encapsulate edge detection functions as function blocks (FB) or subroutines to enhance code reusability.

Mastering the application of positive and negative edges is one of the core skills in PLC programming. By designing logic reasonably, utilizing dedicated instructions, and optimizing programming structure, issues such as false signal triggering and inaccurate counting can be effectively resolved. It is recommended for beginners to:
1. Start with basic instructions to familiarize themselves with PLC edge detection functions.
2. Combine practical cases, such as button control and counter design, to deepen understanding.
3. Focus on debugging techniques by monitoring signal states online to verify logical correctness.

By mastering these methods, the stability and reliability of PLC programs will be significantly improved.

Leave a Comment