The C-level maintenance of Unit 4 is in full swing, with the entire company united in focus and effort, solidly advancing towards the goal of “high-quality maintenance projects.” Let us step into the C-level maintenance site and capture the hardworking silhouettes of the Xindian people!

C-Level Maintenance Highlights

NO.01

Sprint into the Fourth Quarter | C-Level Maintenance

Inspector Sun Xinpeng is conducting wiring acceptance work at the circulating water pump motor of Unit 4. (Zhang Haoliang)

C-Level Maintenance Highlights

NO.03

Sprint into the Fourth Quarter | C-Level Maintenance

Maintenance personnel are diligently addressing the electrical heating failure issue at the terminal box of the No. 2 standby transformer. (Zhang Haoliang)

C-Level Maintenance Highlights

NO.04

Sprint into the Fourth Quarter | C-Level Maintenance

Boiler inspector Guo Xibin is conducting a comprehensive water flushing operation in the furnace to provide a good environment for subsequent furnace maintenance work. (Shang Yiqun)

C-Level Maintenance Highlights

NO.05

Sprint into the Fourth Quarter | C-Level Maintenance

Thermal engineer Xie Juanjuan and Ding Tangxing are performing maintenance work on the actuator, accurately replacing the solenoid valve to ensure the quality of equipment maintenance with a professional attitude. (Xie Juanjuan)

C-Level Maintenance Highlights

NO.06

Sprint into the Fourth Quarter | C-Level Maintenance

Control room maintenance personnel Song Zhihang and Ding Tangxing are meticulously inspecting the actuator and auxiliary equipment at the 6-meter deoxygenator water level valve, strengthening the safety defense of the equipment. (Xie Juanjuan)

C-Level Maintenance Highlights

NO.07

Sprint into the Fourth Quarter | C-Level Maintenance

On-duty operator Cui Huanzhang is accurately executing all operations for shutting down the coal mill to ensure the smooth progress of subsequent maintenance work. (Zhang Weijie)

C-Level Maintenance Highlights

NO.08

Sprint into the Fourth Quarter | C-Level Maintenance

To ensure stable switching and continuous supply of auxiliary power during unit startup, shutdown, and fault conditions, Liu Xiaodan and Zhang Kuan are conducting interconnection drive debugging of the auxiliary power supply to ensure stable interconnection switching. (Zhang Weijie)

Sprint into the Fourth Quarter | C-Level Maintenance

Editor: Yuan Yi Review: Yuan Yuan