Today, let’s talk about some practical tips for PLC ladder diagram programming. Whether you are a beginner or an experienced professional, these tips will help you write clearer and more efficient PLC programs.
Basic Structure of Ladder Diagrams
A ladder diagram, as the name suggests, looks like a ladder. The left side represents the power line, the right side is the neutral line, and the middle contains various logic elements. This structure is quite similar to the wiring in our homes: the left connects to the live wire, the right connects to the ground, and the middle contains various appliances.
The basic components include:
-
• Normally Open Contact ( ): Like a doorbell button, it only closes when pressed -
• Normally Closed Contact (/): Like a switch that can only turn on the light when the door is closed -
• Coil ( ): Can be understood as a light bulb, where the action is executed
Note: The ladder diagram is executed from left to right and top to bottom; this order is crucial as it directly affects the program’s operation results.
Common Programming Tips
1. Latching Circuit
| +-( )-+
| | |
+-(S)-+ |
| +-(/)-+
|
+-( )-+
This is the most commonly used latching circuit. S is the start button, and the coil on the right is the device we want to control. Once S is pressed, the device will continue to operate even after releasing the button. To stop, you must press the stop button (the normally closed contact in the diagram).
Practical Application: For example, on a factory conveyor belt, pressing start will keep it running, and pressing the stop button will halt it.
2. Using Timers
+-(TIM)-+
| |
+-(TON)-+
T#5s
TIM is the trigger condition, and TON is the timer. When the TIM condition is met, the timer starts counting, outputting after 5 seconds.
Tip: Don’t set the timer too short; industrial sites often have disturbances that may cause false triggers. It is generally recommended to set it for at least 100ms.
3. Clever Use of Counters
+-(CTU)-+
| |
+-(CU )-+
PV=10
CTU is an up counter, and CU is the counting trigger condition. Each time the CU condition is met, the count increases by 1 until it reaches the set value PV (which is 10 here).
Practical Case: On a packaging line, it is used to control how many products are packed per box. After counting to 10, it automatically seals the box and conveys the next empty box.
4. Edge Detection
+-(P)-+
| |
+-(N)-+
P is the rising edge, and N is the falling edge. This is very useful when detecting signal changes.
Application Scenario: For instance, when you want to trigger an action at the moment the button is pressed, rather than continuously triggering while holding it down, you can use rising edge detection.
5. Shift Register
+-(SHL)-+
| |
+-(IN )-+
N=8
SHL is the left shift instruction. Each time it is triggered, the data shifts left by one position, commonly used for sequence control on conveyor belts.
Practical Application: To control the sequential actions of multiple workstations on a production line, such as sequentially opening multiple valves.
Common Problems and Solutions
-
1. Confused Program Execution OrderSolution: Draw a flowchart! Don’t rush to write the program; first, outline the entire control logic in a flowchart before programming. -
2. Unexpected ShutdownReason: This may be caused by a watchdog reset.Solution: Add a watchdog command to the main program loop to prevent the program from running away. -
3. Data LossReason: Caused by power outages.Solution: Important data should be periodically saved to a power-off retention area. -
4. The Program Becomes More ChaoticSolution: Use subroutines and function blocks more! Encapsulate relatively independent functions to make the main program much clearer.
Practical Suggestions
-
1. Start with simple controls, such as controlling the start and stop of a motor. -
2. Use simulation software for testing; many problems can be identified during the simulation phase. -
3. Make good use of comments; it will save a lot of trouble during future maintenance. -
4. Regularly back up programs; version management is very important. -
5. Communicate frequently with field workers; their needs often inspire you to optimize the program.
Remember, a good PLC program should not only work properly but also be easy to understand and maintain. I hope these tips will help you write better PLC programs. If you have any questions, feel free to ask me, and let’s continue to advance on the path of automation!