Interior design is a systematic project, and the selection and installation of appliances and furniture are key stages. Proper planning can not only enhance the living experience but also avoid additional costs and inconveniences caused by overlooked details.
Here are some appliances and furniture that need to be reserved in advance, along with important considerations, which we hope will provide reference for your renovation design.
Appliances That Must Be Reserved in Advance
Embedded Appliances
Embedded appliances (such as refrigerators, dishwashers, and steam ovens) should have their models confirmed before the cabinet measurements are taken, and it is recommended to reserve them one month in advance.

This not only controls the size error within 5 millimeters but also ensures that the appliances fit perfectly with the cabinets. When choosing fully embedded models, confirm the heat dissipation direction and door opening direction to avoid inconvenience after installation.
Central Air Conditioning and Ducted Units
Central air conditioning and ducted units should be reserved before the water and electricity work begins. The position of the indoor unit directly affects the ceiling height, and the ducts need to be embedded. If added later, it may require the removal of the ceiling, which is both costly and labor-intensive.

Gas Water Heaters
Gas water heaters should have their models confirmed before tiling. The position of the exhaust pipe determines the size of the tile opening, and zero cold water models need to have return pipes embedded during the water and electricity phase.
Forced exhaust gas water heaters must be placed near a window; otherwise, they may not function properly after installation.

Hidden Appliances
Hidden appliances (such as pipeline machines and retractable clothes drying racks) should be embedded during the concealed works phase.
Pipeline machines need to have PE pipes embedded in advance, and retractable clothes drying racks should be integrated during the ceiling installation, with maintenance openings reserved for future maintenance.
Furniture That Must Be Reserved in Advance
Custom Cabinets
Custom cabinets (such as wardrobes, kitchen cabinets, and sideboards) typically have a production cycle of at least 45 days, so it is recommended to start measuring during the demolition phase.

Confirm the color of the light panels and edge strips in advance to ensure they match the wall color, and accurately reserve positions for appliances like dishwashers and ovens.
Special Size Furniture
Special size furniture (such as irregular sofas and oversized mattresses) should have their placement points determined during the water and electricity phase.
For furniture that cannot fit in the elevator, it is necessary to inform the property management in advance about the hoisting arrangements. The position of the bedside socket should avoid the back of the bed to ensure convenience of use.

Smart Toilets and Concealed Showers
Smart toilets (especially wall-mounted ones) and concealed showers should be reserved during the water and electricity handover.
Smart toilets require the water tank to be embedded and electrical points reserved, while concealed showers need to have embedded components installed in advance to avoid issues after tiling.

Embedded Lighting Fixtures
Embedded lighting fixtures (such as magnetic track lights and linear light strips) should be installed during the ceiling phase.
Track lights need to have slots opened in advance for the transformer, and it is recommended to choose low-voltage light strips and lay out 24V power lines in advance to create a unique spatial atmosphere.
Enhancements for Renovation Design
Whole House WiFi Solution
Embed fiber optics to every room during the water and electricity phase to ensure full WiFi signal coverage without dead spots. A stable network environment is crucial for modern households, and early planning can prevent future network issues.

Robot Vacuum Station
During the water and electricity renovation, reserve water and power outlets, avoiding placing the station in the shower area to prevent moisture from causing short circuits. Proper planning of the station’s location can make cleaning more convenient and efficient.

Pet Appliances
Automatic feeders need to reserve wall outlets, and a 16A power supply should be reserved next to the cat litter box. Planning the power supply locations for pet appliances in advance can make pet life more comfortable and give owners peace of mind.
Purchasing Pitfall Guide
Embedded appliances must be purchased before installation to avoid mismatches between cabinet sizes and appliances.
All embedded components should be photographed for future reference during repairs to clarify the location of pipelines and avoid damage caused by blind construction.
Interior design is a project that requires careful preparation. Planning the selection and installation of appliances and furniture in advance can help you avoid detours during the renovation process and easily create your ideal home environment.