Click the “blue text” above to follow us
National Provincial and Municipal “Zero Carbon Park” Reward Policies andLocal Evaluation Standards are summarized as follows:National “Zero Carbon Park” Reward Policies by Province
| 1. Sichuan Province |
| Action Goal |
By 2027, strive to create a number of zero carbon industrial parks in the province, forming replicable and promotable experiences to promote comprehensive green transformation of economic and social development.Goal: Build 20 near-zero carbon parks by 2025 |
| Key Areas |
Utilization of clean energy at scale, cultivation of green low-carbon industries, support for green low-carbon technologies, construction of smart energy carbon systems, etc. |
| Park Conditions |
The park must be a provincial-level or higher development zone, with an annual industrial output value of over 10 billion yuan, possessing good water and wind resources, and having no major safety or environmental incidents in the past three years. |
| Related Policy Documents |
“Sichuan Province Zero Carbon Industrial Park Pilot Construction Work Plan” (March 6, 2025) https://jxt.sc.gov.cn//scjxt/qtwj/2025/3/6/abaf9b719c2c4000a903c3900a951c4b.shtml |
| 2. Jiangsu Province |
| Action Goal |
Focusing on direct carbon dioxide emissions from energy activities, research and formulate construction indicators and guidelines for near-zero carbon emission demonstration projects, and strengthen policy support for near-zero carbon emission demonstration projects. |
| Key Areas |
(Near) zero carbon industrial parks should establish greenhouse gas accounting capabilities and focus on six aspects: benchmarking energy efficiency levels, cleaning production processes, zero-carbon energy supply, greening infrastructure, recycling resource utilization, and intelligent operation management. |
| Park Conditions |
Demonstration projects should generally start construction during the 14th Five-Year Plan period and continue to promote project completion and production. |
| Related Policy Documents |
“Jiangsu Province (Near) Zero Carbon Industrial Park Construction Guidelines (Interim)” (March 30, 2024) https://fzggw.jiangsu.gov.cn/art/2024/4/17/art_84097_11238769.htmlJiangsu Province Carbon Peak Implementation Plan for Industrial Fields January 17, 2023 https://gxt.jiangsu.gov.cn/art/2023/1/17/art_6278_10729235.html |
| 3. Suzhou City |
| Action Goal |
To form a replicable and promotable management model for green low-carbon development in parks, establishing an international benchmark for sustainable green low-carbon development in parks. |
| Related Policy Documents |
“National Carbon Peak Pilot (Suzhou Industrial Park) Implementation Plan” May 9, 2024 https://www.suzhou.gov.cn/szsrmzf/zfwj/202405/3df5e68dcc1a4bf79947e6cbb4524968.shtml |
| 4. Changzhou City |
| Action Goal |
By the end of 2026, complete the construction of more than 10 near-zero carbon park pilot demonstration projects. |
| Key Areas |
Focus on selecting green industrial parks, parks with relatively concentrated foreign trade exports, “green island” parks for comprehensive governance of hazardous waste, and science and technology innovation industrial parks. |
| Funding and Policy Support |
For parks included in the Changzhou near-zero carbon park pilot plan, a one-time construction subsidy of 500,000 yuan per park will be provided; for near-zero carbon demonstration parks that complete pilot creation and pass acceptance, a maximum of 500,000 yuan will be awarded.Promote zero carbon investment funds to provide capital support for enterprises in the city’s zero carbon technology field, helping to accelerate the resolution of technical bottlenecks. Support financial institutions in providing comprehensive financial service plans for near-zero carbon parks, offering project loans, operational property loans, acquisition loans, asset securitization, leasing, etc., with support in loan limits, interest rates, terms, and repayment methods. Support the issuance of green bonds to promote infrastructure construction for near-zero carbon demonstration projects. |
| Related Policy Documents |
“Changzhou Near-Zero Carbon Park and Near-Zero Carbon Factory Pilot Construction Three-Year Action Plan (2024-2026)” https://www.changzhou.gov.cn/gi_news/516172101018445#:~:text= |
| 5. Nantong City |
| Action Goal |
By 2027, achieve phased progress in near-zero carbon pilot construction work, with the construction goals basically completed, forming a batch of replicable and promotable experiences to lay a solid foundation for the widespread development of near-zero carbon construction in the city. |
| Key Areas |
Focus on constructing a new power system and promoting coordinated pollution reduction and carbon reduction in the city’s near-zero carbon industrial park pilot work. |
| Park Conditions |
1. Clear implementation subject and boundary, significant carbon reduction potential, strong innovation motivation, and certain representativeness and demonstration significance.2. Should have a certain foundation in energy consumption and carbon emission statistics, monitoring, and accounting, actively incorporating the concept of green low-carbon development into medium- and long-term development plans.3. No major safety, environmental, quality accidents in the past three years. The enterprise application subject is not listed in the national enterprise credit information public system’s abnormal operation directory and serious illegal dishonesty list. |
| Funding and Policy Support |
For the first batch of Nantong (near) zero carbon pilot industrial parks, a one-time construction subsidy of up to 800,000 yuan will be provided after passing acceptance. For parks that complete the creation of national carbon peak pilot parks, national pollution reduction and carbon reduction collaborative innovation pilot parks, Jiangsu Province carbon peak and carbon neutrality pilot parks, Jiangsu Province new power system pilot parks, etc., additional funding awards of up to 200,000 yuan and 100,000 yuan will be provided respectively. Each level of the same park can only enjoy one reward, with a maximum funding award of 1,000,000 yuan. |
| Related Policy Documents |
“Nantong (Near) Zero Carbon Pilot Construction Implementation Plan” https://www.nantong.gov.cn/ntsrmzf/2024ndlq/content/8529ec48-8430-4082-966c-d74def92b7e9.html “Nantong (Near) Zero Carbon Pilot Reward Policy Implementation Details” January 13, 2025 https://www.nantong.gov.cn/ntsrmzf/ntsfzhggwyh/content/87ca2581-818b-43ee-957e-e418ed23a6b7.html |
| 6. Zhejiang Province |
| Action Goal |
Establish seven major evaluation indicators for resource utilization greening, infrastructure greening, etc., encouraging parks to establish carbon emission management systems.Hangzhou City:Accelerate the construction of green low-carbon parks. Implement high-quality development implementation opinions for development zones (parks), encouraging key development zones (parks) to formulate carbon peak plans. Implement green low-carbon factory (park) creation projects,By 2025, achieve 10 city-level and above green industrial parks and 400 green low-carbon factories. |
| Related Policy Documents |
“Zhejiang Province Green Low-Carbon Industrial Park Construction Evaluation Guidelines (2024 Edition)” (May 28, 2024) https://jxt.zj.gov.cn/art/2024/5/28/art_1582899_26283.html |
| 7. Anhui Province |
| Action Goal |
By 2027, strive to create more than five zero carbon industrial demonstration parks, forming a batch of replicable and promotable experiences; By 2030, strive to cumulatively build more than 20 zero carbon industrial parks, establishing a long-term mechanism to promote zero carbon development in parks. |
| Key Areas |
Key tasks: Build carbon management systems, break through key zero carbon technologies, construct clean energy systems, enhance resource recycling efficiency, vigorously develop green low-carbon industries, promote comprehensive green transformation of parks, and support the establishment of low-carbon and zero-carbon standards.Focus on industrial clusters or key enterprise industrial parks with strong willingness for green transformation, good creation foundation, and significant demonstration significance, especially in the fields of new energy vehicles, lithium batteries, solar cells, and parks or large factories with high levels of intelligence. |
| Park Conditions |
1. Clear regional boundaries, meeting the zero carbon industrial park creation standards specified in the “Construction Plan”; 2. Should calculate the park’s carbon emissions based on energy statistics and carbon emission accounting methods (see Attachment 2), identify key carbon emission sources, and analyze the carbon emission change trends from 2021 to 2023 and by 2027, having a good low-carbon development foundation and clear zero carbon development goals; 3. Parks with serious pollution incidents, criminal cases of environmental pollution, or major environmental incidents or ecological destruction events are not eligible to apply for creation, and enterprises with serious dishonesty behaviors or key emission units that have not completed compliance in the carbon market in the past three years are not eligible to apply for creation. |
| Related Policy Documents |
“Anhui Province Zero Carbon Industrial Park Construction Plan (Trial)” (May 13, 2024) https://fzggw.ah.gov.cn/public/7011/149418221.html“Initiate Zero Carbon Industrial Park Demonstration Creation Work” https://fzggw.ah.gov.cn/ywdt/tzgg/149460401.html |
| 8. Shandong Province |
| Action Goal |
Select a batch of counties (cities, districts), parks, and communities with a good foundation for low-carbon work, willingness, and eligibility to carry out near-zero carbon demonstration creation. By 2025, build a batch of near-zero carbon cities, near-zero carbon parks, and near-zero carbon communities. Summarize near-zero carbon construction models and paths, forming replicable and promotable near-zero carbon development experiences. |
| Key Areas |
Evaluation indicator system: Near-zero carbon parks include 25 indicators across six areas: low-carbon management, low-carbon energy, low-carbon industry, low-carbon infrastructure, low-carbon transportation, and low-carbon living, with about 14 constraint indicators and 11 reference indicators. |
| Related Policy Documents |
“Shandong Province Near-Zero Carbon City, Near-Zero Carbon Park, Near-Zero Carbon Community Demonstration Creation Implementation Plan” (July 6, 2023)http://xxgk.sdein.gov.cn/zfwj/lhf/202307/t20230710_4371061.html |
| 9. Guizhou Province |
| Related Policy Documents |
Guizhou Province Zero Carbon Industrial Park Evaluation Requirements (Interim) November 11, 2024 https://gxt.guizhou.gov.cn/gxdt/tzgg/202411/t20241112_86056597.html |
| 10. Sanming City, Fujian Province |
| Action Goal |
By 2030, all key industrial parks at the provincial level and above will implement circular transformation. Promote the Sanyuan Economic Development Zone Xiaojiao Industrial Park and the National High-tech Industrial Development Zone Jinsha Park to strive to create a green ecological circular economy industrial base. |
| Key Areas |
Focus on industrial clustering, ecological linkage, and public service infrastructure construction, promoting the hierarchical utilization of park energy, recycling of water resources, comprehensive utilization of waste, and land-saving and intensive utilization, enhancing the energy resource utilization efficiency of parks. Continuously expand the coverage of the green manufacturing system, promote low-zero carbon and circular transformation of industrial parks, and actively guide mature green parks to take the lead in low-zero carbon construction. |
| Related Policy Documents |
“Sanming City Industrial Field Carbon Peak Implementation Plan” (October 12, 2023) http://jxw.sm.gov.cn/szfgzjg/jxw/zfxxgkml/zdjsxm/202311/t20231102_1971474.htm |
| 11. Shanghai City |
| Action Goal |
By 2025, create 5 zero carbon parks |
| Related Policy Documents |
“Shanghai Industrial Field Carbon Peak Implementation Plan” (December 8, 2022) https://www.shanghai.gov.cn/nw12344/20221212/f9ab5f50fe0c4c73884667958d0358ee.html“Energy Saving and Carbon Reduction Action Plan for the Industrial and Communication Industries (2022-2025)” https://fgw.sh.gov.cn/ys-szgyjcssfw-1.7.1/20240118/6541b265109d473ab895579ce6fa135e.html |
| 12. Chongqing City |
| Action Goal |
Create green low-carbon industrial parks. Carry out near-zero carbon park pilot projects, creating a batch of excellent cases for near-zero carbon pilot construction. |
| Related Policy Documents |
“Chongqing Industrial Field Carbon Peak Implementation Plan” (February 7, 2023)https://wap.miit.gov.cn/jgsj/jns/dfdt/art/2023/art_70ef6cb245c04958a5b89b6660e08f4f.html |
| 13. Henan Province |
| Action Goal |
Create green low-carbon industrial parks. |
| Related Policy Documents |
“Henan Province Industrial Field Carbon Peak Implementation Plan” (March 26, 2023)https://www.henan.gov.cn/2023/03-26/2713753.html |
| 14. Hunan Province |
| Action Goal |
By 2025, add 50 provincial-level and above green parks, forming a batch of replicable and promotable excellent experiences and cases for carbon peak. |
| Related Policy Documents |
“Hunan Province Industrial Field Carbon Peak Implementation Plan” (December 22, 2022)https://gxt.hunan.gov.cn/gxt/xxgk_71033/tzgg/202212/t20221222_29166893.html |
| 15. Hebei Province |
| Action Goal |
By 2025, through the practices of established green industrial parks, form a batch of replicable and promotable excellent experiences and cases for carbon peak. By 2030, cumulatively create 30 provincial-level and above green parks. |
| Related Policy Documents |
“Hebei Province Industrial Field Carbon Peak Implementation Plan” (March 29, 2023)https://wap.miit.gov.cn/jgsj/jns/dfdt/art/2023/art_40f3f095c03f4b4d83cde175c5085f78.html |
| 16. Yunnan Province |
| Action Goal |
By 2025, through the practices of established green industrial parks, form a batch of replicable and promotable excellent experiences and cases for carbon peak. |
| Related Policy Documents |
“Yunnan Province Industrial Field Carbon Peak Implementation Plan” (August 25, 2023)https://gxt.yn.gov.cn/zwgk/zc/zfwj2ynsgxw/content_31767 |
| 17. Shanxi Province |
| Action Goal |
Strengthen the construction and sharing of green infrastructure in parks, building a number of demonstration parks with good results in green low-carbon development. |
| Related Policy Documents |
“Shanxi Province Industrial Field Carbon Peak Implementation Plan” (May 30, 2023)http://www.lvliang.gov.cn/llxxgk/zfxxgk/xxgkml/gbmwj/jxw/fdzdgknr_55676/zcwjjjd_55680/202306/t20230626_1771881.html |
Local Evaluation Standards for “Zero Carbon Parks”
| Serial Number |
Region |
Release Date |
Related Documents |
| 1 |
Inner Mongolia Autonomous Region |
April 28, 2023 |
“Zero Carbon Industrial Park Construction Standards” |
| 2 |
Xiong’an New Area |
December 22, 2023 |
“Xiong’an New Area Zero Carbon Park Evaluation Standards” |
| 3 |
Hainan Province |
March 14, 2024 |
“Boao Near-Zero Carbon Demonstration Zone Creation Technical Standards”https://zc.gjzwfw.gov.cn/art/2024/3/20/art_14_73052.html |
| 4 |
Fujian Province |
July 3, 2024 |
“Low Zero Carbon Creation Assessment Guidelines for Industrial Parks” |
| 5 |
Yancheng |
July 22, 2024 |
“Yancheng Coastal (Near) Zero Carbon Industrial Park Construction Standards” https://www.yancheng.gov.cn/art/2024/7/22/art_3251_4214859.html |

The End