PLC Configuration for External Operation of KUKA Robots

PLC Configuration for External Operation of KUKA Robots

Before the external startup of KUKA robots, the configuration on the robot side has been introduced. For complete operation, the PLC side also requires a complete configuration.1. The PLC configuration mainly controls the timing of interaction signals with the robot. There are many specific timing introductions, so we will directly introduce the finished program. The … Read more