Classic Case Study of Zhonglong Environment | Low Voltage Power Distribution and PLC Centralized Control System Construction Project

Classic Case Study of Zhonglong Environment | Low Voltage Power Distribution and PLC Centralized Control System Construction Project

Project Background A certain environmental technology company has newly constructed two zinc oxide production lines, with the main sections including rotary kilns, waste heat boilers, bag dust collectors, flue gas desulfurization systems, and other production systems. According to production management requirements, a PLC control system needs to be established to achieve remote control of the … Read more

Successful Commissioning of Baoxin Large PLC Control System for Hot-Dip Galvanizing Mill

Successful Commissioning of Baoxin Large PLC Control System for Hot-Dip Galvanizing Mill

Original work in Automation and Engineering Technology. On June 26, 2025, the Guangxi Hongwang 1550 acid-pickling mill combined unit, utilizing the Baoxin large PLC control system, was successfully commissioned. This project is located in the Fangchenggang Economic and Technological Development Zone, Fangchenggang City, with a construction scale of an annual production capacity of 1.5 million … Read more