1
1. Remote Monitoring and Data Visualization
Basic Concept By utilizing the Ethernet interface of Siemens S7-1200/1500 series PLCs, combined with Alibaba Cloud IoT platform, real-time data collection and remote monitoring of equipment operation can be achieved. The key point is the integration of PLC with MQTT protocol.
Hardware Configuration
-
PLC side: Configure CP1543-1 communication module, connect to factory switch
-
Network layer: Deploy industrial firewall, open TCP port 1883 (default MQTT port)
-
Cloud side: Create device triplet (ProductKey, DeviceName, DeviceSecret) on Alibaba Cloud IoT platform
Code Example (TIA Portal Ladder Diagram)
// Data packaging program blockCALL "MQTT_PUBLISH"// Call Alibaba Cloud communication function blockTopic := 'factory/device01/temp', Payload := DB101.DBD20,// Temperature data storage addressQ_Error := M100.0// Error status bit
Real Case In an automotive welding workshop, the S7-1500 collects welding current and cylinder pressure data, uploading it to the cloud every 5 seconds. Operations personnel can view the equipment OEE (Overall Equipment Effectiveness) in real-time through Alibaba Cloud DataV dashboard, with automatic DingTalk alerts triggered during anomalies.
Common Issues
-
Data Disconnection: Check the PLC’s KeepAlive interval (recommended ≤60 seconds)
-
Time Zone Confusion: Force use of UTC time in PLC system time configuration
-
High Load: Optimize data upload frequency, upload key parameters in real-time, and change secondary data to trigger upon change
Precautions Ensure bidirectional certificate authentication is configured between PLC and cloud to avoid man-in-the-middle attacks. There have been cases where production data was intercepted due to not enabling TLS encryption.
2
2. Predictive Maintenance System
Hardware Solution Install vibration sensors (4-20mA output) on motor equipment, connecting them to the PLC via the SM1231 analog module. Vibration data is pre-processed by the PLC and uploaded to Alibaba Cloud big data analysis platform.
Diagnosis Logic
// Vibration exceeds standard judgmentA( L AIW256 // Original vibration valueL 27648 // Corresponding to 20mA range/D // Convert to percentageL 80 // Alarm threshold>I )= M200.5 // Trigger early warning signal
Typical Application A fan manufacturer embedded FFT spectrum analysis algorithms in the PLC to identify bearing wear characteristic frequencies. When energy in a specific frequency band exceeds the limit continuously for three times, a work order is automatically generated and dispatched to the maintenance system.
Tuning Tips Use an oscilloscope to compare the original signal from the sensor with the value collected by the PLC; a case was found where poor grounding caused 50Hz power frequency interference, later resolved by installing a signal isolator.
3
3. Intelligent Energy Management
Implementation Steps
-
Connect the power meter to the PLC serial port via Modbus RTU (CM1241 module)
-
PLC parses power meter data (voltage, current, power factor)
-
Automatically generate energy consumption reports and upload to the cloud at midnight
Optimization Suggestions Implement time-based electricity pricing strategy in the PLC:
IF TIME_OF_DAY() BETWEEN 8:00 AND 22:00 THEN SET_POWER_MODE := 1 // Peak modeELSE SET_POWER_MODE := 2 // Valley modeEND_IF
Lessons Learned A project failed to consider daylight saving time switch, resulting in a 1-hour deviation in time-based control. The solution is to configure NTP time synchronization in the PLC to directly obtain time service from Alibaba Cloud.
4
4. Flexible Production Control System
Communication Architecture The PLC interfaces with the MES system via OPC UA protocol, receiving personalized order parameters. Alibaba Cloud Function Compute dynamically generates control programs and sends them to the PLC for execution.
Ladder Diagram Example
// Order parameter processingCALL "JSON_Parse" IN_String := DB200.STRING_Data, OUT_ProductCode := DB201.DBW10, OUT_Quantity := DB201.DBD12
Fault Handling When the network is interrupted, the PLC automatically switches to local caching mode, executing the last valid production instruction to ensure the production line does not stop.
5
5. Digital Twin Applications
Data Synchronization Mechanism
-
PLC uploads physical quantities such as device coordinates and speed in real-time
-
Cloud-side three-dimensional model synchronization drive
-
Process simulation results are written back to PLC control parameters
Implementation Points
-
Use Alibaba Cloud TSDB time series database to store historical data
-
Use lightweight Protobuf protocol instead of JSON, reducing bandwidth by 60%
-
Set data check bits in the PLC to avoid overload of equipment due to erroneous simulation parameters
6
Practical Suggestions
-
Start experiments with S7-1200: Configure MQTT client and connect to Alibaba Cloud public testing instance
-
Use Modbus Slave software to simulate on-site equipment and test PLC data collection stability
-
Create real-time data dashboards in DataV, linking to the PLC’s OPC UA server address
Security Warnings
-
Disable anonymous access to the PLC’s web server
-
Set write protection passwords for DB blocks
-
Regularly scan for network vulnerabilities using PRONETA tool
Industrial IoT is not merely about connecting devices; the real value lies in data-driven decision making. A certain electronics factory optimized production rhythm using PLC data, increasing capacity by 17% in three months. It is advisable to first select 1-2 pain point scenarios to gradually build a complete solution.