
Digital transformation is an essential path for enterprise development.
The application of 5G and IoT technologies, global supply chain restructuring…
and various other factors
have reduced the implementation costs of digital transformation for enterprises,
greatly stimulating the enthusiasm of enterprises to move their equipment to the cloud.
This company located in the Economic Development Zone
Jiangsu Shitai Long Internet of Things Co., Ltd.
is indeed a leader in digital platforms for SMEs.

Shitai Long’s Feixiang Cloud Platform was established in 2018. The founding team has over twenty years of deep experience in the metal processing industry, with a profound understanding of industry application scenarios and customer needs. The independently developeddata collector and VMES visualization production management system provide SMEs with a one-stop digital cloud solution, achieving internal data integration, reducing procurement costs; visible energy management, reducing energy consumption; and upstream and downstream data integration, reducing supply chain management costs.
It is reported that after using the system, partner companies can achieve observable and controllable product production processes through daily data analysis, with an average product production cycle prediction accuracy improvement of 8%, product yield improvement of 10%, equipment utilization rate improvement of 12%, procurement costs reduced by 10%, and energy consumption reduced by 8%.

Shitai Long’s General Manager, Shi Xianjun, introduced that the Feixiang Cloud Platform enhances the data collection capabilities of production and equipment through an integrated deployment of “hardware + software.” In terms of hardware, it relies on the embedded algorithms in the collector to provide accurate, real-time, complete, and secure data for the cloud management software. In the software domain, application apps are developed to facilitate daily management of machinery and workshops, while also providing a standardized, modular, and lightweight management toolset tailored to industry attributes for enterprise managers.
Next, let’s take a closer look at how the
Feixiang Cloud Platform
achieves a “soft and hard approach”
Hardware: DSS External Digital Bionic System 
The data collector (hardware) adopts an ARM + 4G module architecture design, ARMv7-M architecture 32-bit Cortex-M4 CPU, integrating FPU, MPU, supporting SIMD instruction DSP, and CoreSight standard debugging unit. The maximum operating frequency is 200MHz, and the Flash acceleration unit achieves 0-wait program execution, reaching 250 DMIPS or 680 Coremarks computational performance.
It fills the domestic gap in data collection, featuring lossless non-invasive collection, non-stop installation, and remote online upgrades among its advantages.
Software: VMES – Visualization Production Management System
(Feixiang Cloud Platform Industrial Big Data Map)
VMES – Visualization Production Management System (software) is applied in the metal processing industry, SMEs, and equipment cloud products, solving the scheduling difficulties of SMEs with “multiple work orders, multiple processes, and multiple materials” by standardizing, modularizing, lightweighting, and mass-producing outputs, reducing the costs of enterprise upgrades and promoting high-quality development in manufacturing.

(Visualization Dashboard)
Production Visualization Dashboard
Equipment Visualization Dashboard
Meanwhile, the system also features highlights such as “three-day installation delivery, cloud SaaS deployment, and non-stop installation,” providing six major benefits: one machine one code to prevent idling, clear division of labor to prevent buck-passing, data upload to prevent fraud, optimized processes to improve utilization rates, efficient scheduling to enhance employee performance, and observable processes to improve decision-making efficiency.
In addition to providing a one-stop digital cloud solution,
Shitai Long also developed a capacity sharing system
The system automatically cross-compares big data
for online order acceptance by enterprises
to achieve capacity adjustment between industries,
reducing costs and increasing efficiency for enterprises.

Feixiang Cloud Platform uses big data modeling and analysis to provide industries and governments with capacity maps, equipment performance indices, and enterprise competitiveness indices, improving industry development efficiency and enhancing government decision-making efficiency. In the future, Shitai Long will continue to work with high-quality enterprises in the Economic Development Zone to assist more enterprises in digital transformation and promote high-quality development in manufacturing.
Technological innovation is the key to forging new productive forces.
Next, the Economic Development Zone will work together with various enterprises
to focus on breaking through the bottlenecks that hinder the development of new productive forces,
promoting the specialized and innovative development of SMEs,
and cultivating and expanding advanced manufacturing clusters
to achieve high-quality economic development.
END
Drafted by | Party and Mass Work Office, Sun Chong
Edited by | Sun Chong
Reviewed by | Wang Mingke
Proofread by | Que Chenli
Approved by | Li Huizhong
Issued by | Ding Jian