C-Level Maintenance in Progress
Unit 4
Glory belongs to the laborers! Happiness belongs to the laborers!

With the drums of war urging the horses to gallop, it is the right time to forge ahead!

Since the start of the C-level maintenance for Unit 4, all inspection personnel have been racing against time and facing challenges head-on, writing a moving chapter of struggle on the maintenance battlefield with iron will and superb skills!

01
Maintenance Department 1
Extraction of the Turbine Rotor for Unit 4



Adjusting the Rotor Level Before Lifting the Low-Pressure Rotor of Unit 4



Flipping the Inner Cylinder of the Low-Pressure Cylinder for Unit 4



Inspection of the Low-Temperature Superheater by the Boiler Specialists



Maintenance of the Coal Feeder by the Grinding Specialists



Maintenance of the Dry Ash Conveyor for Unit 4 by the Environmental Protection Specialists




02
Maintenance Department 2

Inspection of the Variable Frequency Drive for the Booster Fan of Unit 4 by the Thermal Control Specialists

Modification of the 6kV Switch Relay Protection for Unit 4 by the Electrical Specialists



Inspection of the Bushing of the No. 2 Transformer

Replacement of the C Phase Bushing of the No. 2 Transformer


03
Fuel Maintenance Department
Safety Briefing

Equipment Inspection

Repair of the Power Supply Box

Lighting Repair

Conveyor Belt Adhesion

Cleaning and Sanitation


04
Power Generation Operations Department
Chemical Auxiliary Control Operations

Implement measures to shut down the No. 2 Deionized Water Pump

Inspect the equipment of the offline Unit 4

Close the air tank outlet door of Unit 4

Night inspection of the acid pipeline